| Assessment Year | 1985 |
|---|---|
| Principal Product | CAST IRON PRODUCTS |
| NAICS |
n/a
|
| SIC | 3321: Gray and Ductile Iron Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 40 |
| Plant Area |
n/a
|
| Annual Production | 1,800,000
lb
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $164,348 | 1,934,936 |
kWh
|
$0.085 |
| LPG | $14,355 | 1,557 |
MMBtu
|
$9.22 |
| Fuel Oil #2 | $2,907 | 420 |
MMBtu
|
$6.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,428 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,590 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2447: Heat water with exhaust heat | $1,549 | $1,473 |
$1,549
18,171
kWh
|
- | - | |
| 02 | 2.4321: Upgrade obsolete equipment | $2,907 | - | - | - |
$2,907
-
MMBtu
|
|
| 03 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $68 | $60 |
$68
879
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $332 | $100 |
$332
3,810
kWh
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $993 | $2,500 |
$993
11,723
kWh
|
- | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,590 | $500 |
$7,590
89,390
kWh
|
- | - | |
| 07 | 2.2491: Use cooling air which cools hot work pieces for space heating | $1,989 | $1,700 | - |
$1,989
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $15,428 | $6,333 |
$10,532
123,973
kWh
|
$1,989
-
MMBtu
|
$2,907
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,590 | $500 |
$7,590
89,390
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs