Assessment Year 1985
Principal Product CAST IRON PRODUCTS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 1,800,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,348 1,934,936
kWh
LPG $14,355 1,557
MMBtu
Fuel Oil #2 $2,907 420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.2447: Heat water with exhaust heat $1,549 $1,473 $1,549
18,171
kWh
- -
02 2.4321: Upgrade obsolete equipment $2,907 - - - $2,907
-
MMBtu
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $68 $60 $68
879
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $332 $100 $332
3,810
kWh
- -
05 2.3212: Optimize plant power factor $993 $2,500 $993
11,723
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,590 $500 $7,590
89,390
kWh
- -
07 2.2491: Use cooling air which cools hot work pieces for space heating $1,989 $1,700 - $1,989
-
MMBtu
-
TOTAL RECOMMENDED $15,428 $6,333 $10,532
123,973
kWh
$1,989
-
MMBtu
$2,907
-
MMBtu
TOTAL IMPLEMENTED $7,590 $500 $7,590
89,390
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs