ITAC Assessment: MA0042
ITAC logo
ITAC Assessment: MA0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLASTIC CLOSURES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $989,404 11,592,028
kWh
Natural Gas $9,453 1,259
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,258

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $1,464 $200 $1,464
17,292
kWh
02 2.4322: Use or replace with energy efficient substitutes $15,060 $24,450 $15,060
177,315
kWh
03 2.7226: Use computer programs to optimize hvac performance $326 $280 $326
3,810
kWh
04 2.3212: Optimize plant power factor $9,522 $13,420 $9,522
67,116
kWh
05 2.4312: Improve lubrication practices $194 $147 $194
2,345
kWh
06 2.2711: Utilize outside air instead of conditioned air for drying $9,886 - $9,886
116,354
kWh
TOTAL RECOMMENDED $36,452 $38,497 $36,452
384,232
kWh
TOTAL IMPLEMENTED $36,258 $38,350 $36,258
381,887
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs