ITAC Assessment: MA0038
ITAC logo
ITAC Assessment: MA0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product COATED METAL PARTS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 36
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,571 1,815,358
kWh
Natural Gas $76,410 11,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,045 $300 $1,045
12,309
kWh
-
02 2.2437: Recover waste heat from equipment $3,400 $2,938 - $3,400
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $892 $112 $892
10,551
kWh
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,867 $500 - $2,867
-
MMBtu
05 2.2437: Recover waste heat from equipment $10,939 $2,229 - $10,939
-
MMBtu
06 2.2437: Recover waste heat from equipment $2,662 $3,816 $(-79.0)
(-879)
kWh
$2,741
-
MMBtu
TOTAL RECOMMENDED $21,805 $9,895 $1,858
21,981
kWh
$19,947
-
MMBtu
TOTAL IMPLEMENTED $19,143 $6,079 $1,937
22,860
kWh
$17,206
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs