ITAC Assessment: MA0037
ITAC logo
ITAC Assessment: MA0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SAFETY EQUIPMENT
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,880 4,607,269
kWh
Fuel Oil #2 $11,029 1,547
MMBtu
Fuel Oil #6 $79,654 13,201
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,470 $452 $3,470
44,549
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $977 $1,500 - $1,265
-
MMBtu
- $(-288.0)
03 2.4221: Install compressor air intakes in coolest locations $1,228 $400 $1,228
15,826
kWh
- - -
04 2.4322: Use or replace with energy efficient substitutes $6,309 $11,314 $6,309
80,891
kWh
- - -
05 2.7226: Use computer programs to optimize hvac performance $1,730 $400 $2,671
34,291
kWh
- $(-941.0)
-
MMBtu
-
06 2.2113: Repair or replace steam traps $3,789 $533 - - $5,489
-
MMBtu
$(-1,700.0)
07 2.2437: Recover waste heat from equipment $13,893 $27,500 - - $13,893
-
MMBtu
-
TOTAL RECOMMENDED $31,396 $42,099 $13,678
175,557
kWh
$1,265
-
MMBtu
$18,441
-
MMBtu
$(-1,988.0)
TOTAL IMPLEMENTED $17,503 $14,599 $13,678
175,557
kWh
$1,265
-
MMBtu
$4,548
-
MMBtu
$(-1,988.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs