ITAC Assessment: MA0036
ITAC logo
ITAC Assessment: MA0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product NYLON & POLYESTER CLOTH
NAICS
n/a
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,201,805 14,084,994
kWh
Fuel Oil #6 $183,692 35,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,352 $550 $1,352
15,826
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,279 $476 $13,279
154,162
kWh
- -
03 2.7122: Disconnect ballasts $2,457 $1,250 $2,457
28,722
kWh
- -
04 2.7226: Use computer programs to optimize hvac performance $450 $1,200 $450
5,275
kWh
- -
05 3.6121: Burn waste paper for heat $9,651 $9,075 - $8,151
-
MMBtu
$1,500
06 2.2443: Re-use or recycle hot or cold process exhaust air $2,006 $2,027 $2,006
23,447
kWh
- -
07 2.3191: Use demand controller or load shedder $5,548 $15,000 $5,548
-
kWh
- -
TOTAL RECOMMENDED $34,743 $29,578 $25,092
227,432
kWh
$8,151
-
MMBtu
$1,500
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs