Assessment Year | 2002 |
---|---|
Principal Product | Plating and Anodizing |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
80,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $378,594 | 10,118,469 |
kWh
|
$0.037 |
Electricity Demand | $135,197 | 22,722 |
kW-mo/yr
|
$5.95 |
Electricity Fees | $15,583 | - |
|
- |
Natural Gas | $411,963 | 74,580 |
MMBtu
|
$5.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $335,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $870 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3132: Use reverse osmosis to concentrate material | $151,650 | $60,000 | - | - | - |
$151,650
-
Tgal
|
|
02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $104,205 | $715,000 | n/a |
$184,662
4,675,000
kWh
|
$82,896
-
kW-mo/yr
|
$(-163,353.0)
-
MMBtu
|
- |
03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $65,100 | $150,000 | n/a |
$40,954
1,036,800
kWh
|
$24,146
-
kW-mo/yr
|
- | - |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,681 | $8,775 |
$4,588
116,160
kWh
|
$1,093
-
kW-mo/yr
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $5,487 | $15,000 | n/a | - | - |
$5,487
-
MMBtu
|
- |
06 | 2.7135: Install occupancy sensors | $870 | $150 |
$870
22,033
kWh
|
- | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $850 | - |
$850
21,506
kWh
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,492 | $630 |
$1,228
31,083
kWh
|
$264
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $335,335 | $949,555 |
$233,152
5,902,582
kWh
|
$108,399
-
kW-mo/yr
|
$(-157,866.0)
-
MMBtu
|
$151,650
-
Tgal
|
||
TOTAL IMPLEMENTED | $870 | $150 |
$870
22,033
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs