| Assessment Year | 2002 |
|---|---|
| Principal Product | Plating and Anodizing |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
80,000
ft2
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $378,594 | 10,118,469 |
kWh
|
$0.037 |
| Electricity Demand | $135,197 | 22,722 |
kW-mo/yr
|
$5.95 |
| Electricity Fees | $15,583 | - |
|
- |
| Natural Gas | $411,963 | 74,580 |
MMBtu
|
$5.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $335,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $870 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.3132: Use reverse osmosis to concentrate material | $151,650 | $60,000 | - | - | - |
$151,650
-
Tgal
|
|
| 02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $104,205 | $715,000 | n/a |
$184,662
4,675,000
kWh
|
$82,896
-
kW-mo/yr
|
$(-163,353.0)
-
MMBtu
|
- |
| 03 | 2.2621: Modify refrigeration system to operate at a lower pressure | $65,100 | $150,000 | n/a |
$40,954
1,036,800
kWh
|
$24,146
-
kW-mo/yr
|
- | - |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,681 | $8,775 |
$4,588
116,160
kWh
|
$1,093
-
kW-mo/yr
|
- | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $5,487 | $15,000 | n/a | - | - |
$5,487
-
MMBtu
|
- |
| 06 | 2.7135: Install occupancy sensors | $870 | $150 |
$870
22,033
kWh
|
- | - | - | |
| 07 | 2.7124: Make a practice of turning off lights when not needed | $850 | - |
$850
21,506
kWh
|
- | - | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,492 | $630 |
$1,228
31,083
kWh
|
$264
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $335,335 | $949,555 |
$233,152
5,902,582
kWh
|
$108,399
-
kW-mo/yr
|
$(-157,866.0)
-
MMBtu
|
$151,650
-
Tgal
|
||
| TOTAL IMPLEMENTED | $870 | $150 |
$870
22,033
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs