Assessment Year | 2010 |
---|---|
Principal Product | Oilfield tools |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
65,000
ft2
|
Annual Production | 168,000
pieces
|
Production Hrs. Annual | 2,084
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,387 | 948,195 |
kWh
|
$0.088 |
Electricity Demand | $40,242 | 4,248 |
kW-mo/yr
|
$9.47 |
Electricity Fees | $6,629 | - |
|
- |
Natural Gas | $6,836 | 979 |
MMBtu
|
$6.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,803 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $14,160 | - | - | - | $7,080 | - | - | $7,080 | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $5,950 | $6,850 |
$9,780
123,800
kWh
|
$1,500
-
kW-mo/yr
|
- |
$(-5,330.0)
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,800 | $20,100 |
$3,990
50,500
kWh
|
$1,810
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,540 | $300 |
$1,060
13,400
kWh
|
$480
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7135: Install occupancy sensors | $1,263 | $79 |
$840
10,600
kWh
|
$423
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,040 | $760 |
$1,040
13,120
kWh
|
- | - | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $757 | $16 |
$520
6,600
kWh
|
$237
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7145: Install skylights | $740 | $1,600 |
$740
9,400
kWh
|
- | - | - | - | - | |
09 | 2.7145: Install skylights | $450 | $970 |
$450
5,650
kWh
|
- | - | - | - | - | |
10 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $280 | $300 | - | - | - | - | $280 | - | |
TOTAL RECOMMENDED | $31,980 | $30,975 |
$18,420
233,070
kWh
|
$4,450
-
kW-mo/yr
|
$7,080 |
$(-5,330.0)
-
MMBtu
|
$280 | $7,080 | ||
TOTAL IMPLEMENTED | $23,803 | $21,239 |
$6,930
87,620
kWh
|
$2,713
-
kW-mo/yr
|
$7,080 | - | - | $7,080 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs