ITAC Assessment: AM0576
ITAC logo
ITAC Assessment: AM0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Oilfield tools
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 65,000
ft2
Annual Production 168,000
pieces
Production Hrs. Annual 2,084
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,387 948,195
kWh
Electricity Demand $40,242 4,248
kW-mo/yr
Electricity Fees $6,629 -
Natural Gas $6,836 979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $14,160 - - - $7,080 - - $7,080
02 2.1321: Replace fossil fuel equipment with electrical equipment $5,950 $6,850 $9,780
123,800
kWh
$1,500
-
kW-mo/yr
- $(-5,330.0)
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,800 $20,100 $3,990
50,500
kWh
$1,810
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,540 $300 $1,060
13,400
kWh
$480
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $1,263 $79 $840
10,600
kWh
$423
-
kW-mo/yr
- - - -
06 2.4239: Eliminate or reduce compressed air usage $1,040 $760 $1,040
13,120
kWh
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $757 $16 $520
6,600
kWh
$237
-
kW-mo/yr
- - - -
08 2.7145: Install skylights $740 $1,600 $740
9,400
kWh
- - - - -
09 2.7145: Install skylights $450 $970 $450
5,650
kWh
- - - - -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $280 $300 - - - - $280 -
TOTAL RECOMMENDED $31,980 $30,975 $18,420
233,070
kWh
$4,450
-
kW-mo/yr
$7,080 $(-5,330.0)
-
MMBtu
$280 $7,080
TOTAL IMPLEMENTED $23,803 $21,239 $6,930
87,620
kWh
$2,713
-
kW-mo/yr
$7,080 - - $7,080
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs