ITAC Assessment: MA0032
ITAC logo
ITAC Assessment: MA0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SPECIALTY FABRICS
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 3,459,600
lb
Production Hrs. Annual 3,366
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,667 8,258,500
kWh
LPG $140,235 25,149
MMBtu
Fuel Oil #6 $512,709 91,148
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $298,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1221: Replace obsolete burners with more efficient ones $51,867 $52,000 - - $51,867
-
MMBtu
-
02 2.5191: Modify dye beck $4,749 $1,800 - - $4,749
-
MMBtu
-
03 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $41,282 $82,500 $51,258
742,966
kWh
- $(-9,976.0)
-
MMBtu
-
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $173,755 $126,200 $138,690
2,009,965
kWh
- $14,965
-
MMBtu
$20,100
05 2.2443: Re-use or recycle hot or cold process exhaust air $11,311 $24,900 - $11,311
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,902 $2,400 $14,902
216,002
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $485 $120 $485
7,034
kWh
- - -
TOTAL RECOMMENDED $298,351 $289,920 $205,335
2,975,967
kWh
$11,311
-
MMBtu
$61,605
-
MMBtu
$20,100
TOTAL IMPLEMENTED $15,387 $2,520 $15,387
223,036
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs