ITAC Assessment: MA0028
ITAC logo
ITAC Assessment: MA0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product NON-FERROUS TUBING
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 750
ton
Production Hrs. Annual 4,116
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,184 866,940
kWh
Natural Gas $142,487 18,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,972 $18,343 $6,972
73,271
kWh
-
02 2.2437: Recover waste heat from equipment $1,990 $3,525 $(-252.0)
(-2,638)
kWh
$2,242
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $218 $262 $(-13.0)
(-293)
kWh
$231
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,497 $94 $4,497
47,479
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $606 $209 $606
6,448
kWh
-
TOTAL RECOMMENDED $14,283 $22,433 $11,810
124,267
kWh
$2,473
-
MMBtu
TOTAL IMPLEMENTED $4,497 $94 $4,497
47,479
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs