ITAC Assessment: LT8427
ITAC logo
ITAC Assessment: LT8427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Water Bottles
NAICS 312112: Bottled Water Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 218,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 1,717
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $330,337 4,369,680
kWh
Electricity Demand $134,665 11,950
kW-mo/yr
Waste Disposal Costs
Water Usage $9,262 1,546
Tgal
Water Disposal $17,272 1,546
Tgal
Solid Waste (non-haz) $19,751 273,040
lb
TOTAL YEARLY COSTS $511,288
RECOMMENDED SAVINGS* $250,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $453 $947 $249
3,300
kWh
$221
-
kW-mo/yr
- - $(-17.1)
02 4.124: Install continuous lubrication equipment $15,925 $14,354 $(-324.2)
(-4,205)
kWh
$(-66.0)
-
kW-mo/yr
- - $16,315
03 3.1192: Reduce scrap production $234,233 $35,000 - - $15,801
-
lb
$218,432 -
TOTAL RECOMMENDED $250,611 $50,301 $(-74.7)
(-905)
kWh
$155
-
kW-mo/yr
$15,801
-
lb
$218,432 $16,298
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs