ITAC Assessment: MA0023
ITAC logo
ITAC Assessment: MA0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ALUM & BRONZE CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 412,000
lb
Production Hrs. Annual 2,375
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,825 585,287
kWh
LPG $7,903 872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,488

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,752 $4,628 $9,556
124,560
kWh
$(-4,804.0)
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $225 $100 $225
2,931
kWh
-
03 2.7244: Revise smoke cleanup from operations $6,061 $1,447 $6,061
79,132
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $450 $66 $450
5,862
kWh
-
TOTAL RECOMMENDED $11,488 $6,241 $16,292
212,485
kWh
$(-4,804.0)
-
MMBtu
TOTAL IMPLEMENTED $11,488 $6,241 $16,292
212,485
kWh
$(-4,804.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs