Assessment Year | 1985 |
---|---|
Principal Product | ALUM & BRONZE CASTINGS |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $1 M to 5M |
# of Employees | 25 |
Plant Area |
n/a
|
Annual Production | 412,000
lb
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,825 | 585,287 |
kWh
|
$0.077 |
LPG | $7,903 | 872 |
MMBtu
|
$9.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,488 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,488 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,752 | $4,628 |
$9,556
124,560
kWh
|
$(-4,804.0)
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $225 | $100 |
$225
2,931
kWh
|
- | |
03 | 2.7244: Revise smoke cleanup from operations | $6,061 | $1,447 |
$6,061
79,132
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $450 | $66 |
$450
5,862
kWh
|
- | |
TOTAL RECOMMENDED | $11,488 | $6,241 |
$16,292
212,485
kWh
|
$(-4,804.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,488 | $6,241 |
$16,292
212,485
kWh
|
$(-4,804.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs