ITAC Assessment: MA0020
ITAC logo
ITAC Assessment: MA0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLASTIC PRODUCTS
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 450,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,496 4,621,923
kWh
Natural Gas $104,511 15,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $11,592 $6,000 - $11,592
-
MMBtu
-
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $9,754 $56,300 $37,200
599,941
kWh
$(-23,446.0)
-
MMBtu
$(-4,000.0)
03 2.7231: Use radiant heater for spot heating $4,696 $13,000 - $4,696
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $852 $100 $852
17,292
kWh
- -
TOTAL RECOMMENDED $26,894 $75,400 $38,052
617,233
kWh
$(-7,158.0)
-
MMBtu
$(-4,000.0)
TOTAL IMPLEMENTED $22,198 $62,400 $38,052
617,233
kWh
$(-11,854.0)
-
MMBtu
$(-4,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs