Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Treated Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2491: Wood Preserving
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 1,080,000
ft2
Annual Production 13,000,000
units
Production Hrs. Annual 2,078
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,825 1,044,480
kWh
Electricity Demand $21,380 5,845
kW-mo/yr
Waste Disposal Costs
Water Usage $2,616 866
Tgal
Water Disposal $1,762 866
Tgal
TOTAL YEARLY COSTS $156,582
RECOMMENDED SAVINGS* $3,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $1,098 $1,502 $822
6,376
kWh
$276
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,876 $190 $2,876
22,296
kWh
-
03 2.7135: Install occupancy sensors $19 $39 $16
126
kWh
$2
-
kW-mo/yr
TOTAL RECOMMENDED $3,993 $1,731 $3,715
28,797
kWh
$278
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs