ITAC Assessment: MA0019
ITAC logo
ITAC Assessment: MA0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HEATING ELEMENTS
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 317
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,533 2,776,084
kWh
Natural Gas $60,601 8,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $2,633 $900 - $2,633
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $1,403 $800 $1,403
22,274
kWh
-
03 2.2511: Insulate bare equipment $380 $153 - $380
-
MMBtu
04 2.2511: Insulate bare equipment $39 $98 $39
586
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,127 $4,000 $1,964
30,774
kWh
$(-837.0)
-
MMBtu
TOTAL RECOMMENDED $5,582 $5,951 $3,406
53,634
kWh
$2,176
-
MMBtu
TOTAL IMPLEMENTED $4,036 $1,700 $1,403
22,274
kWh
$2,633
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs