ITAC Assessment: MA0018
ITAC logo
ITAC Assessment: MA0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SINTERED METAL PARTS
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 7,056
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $569,870 8,465,123
kWh
Natural Gas $315,887 52,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,776 $450 $1,776
26,377
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,840 $756 - $5,840
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $12,935 $31,465 $7,963
118,992
kWh
$4,972
-
MMBtu
TOTAL RECOMMENDED $20,551 $32,671 $9,739
145,369
kWh
$10,812
-
MMBtu
TOTAL IMPLEMENTED $20,551 $32,671 $9,739
145,369
kWh
$10,812
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs