| Assessment Year | 2010 |
|---|---|
| Principal Product | kitchen cabinet component and parts |
| NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
185,000
ft2
|
| Annual Production | 5,000,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $495,714 | 5,581,600 |
kWh
|
$0.089 |
| Electricity Demand | $109,906 | 12,898 |
kW-mo/yr
|
$8.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $485,837 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,414 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $390,835 | $2,640,000 |
$303,340
3,420,096
kWh
|
$109,906
-
kW-mo/yr
|
$(-22,411.0) | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,285 | $50,000 |
$33,682
378,458
kWh
|
$18,603
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,204 | $35,000 |
$13,664
153,535
kWh
|
$7,540
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,686 | $1,840 |
$6,884
77,344
kWh
|
$3,802
-
kW-mo/yr
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,513 | $1,000 |
$1,678
18,853
kWh
|
$835
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,215 | $58,964 |
$4,718
50,744
kWh
|
$2,497
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $1,099 | $104 |
$1,099
12,355
kWh
|
- | - | |
| TOTAL RECOMMENDED | $485,837 | $2,786,908 |
$365,065
4,111,385
kWh
|
$143,183
-
kW-mo/yr
|
$(-22,411.0) | ||
| TOTAL IMPLEMENTED | $20,414 | $61,804 |
$13,280
146,941
kWh
|
$7,134
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs