Assessment Year | 1995 |
---|---|
Principal Product | Lighting Fixtures |
NAICS |
n/a
|
SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
45,000
ft2
|
Annual Production | 540,000
lb
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,660 | 103,751 |
kWh
|
$0.24 |
Natural Gas | $14,911 | 1,667 |
MMBtu
|
$8.94 |
Fuel Oil #2 | $13,115 | 1,479 |
MMBtu
|
$8.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,458 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,145 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,384 | $1,243 |
$2,384
9,086
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,879 | $7,205 |
$2,879
11,137
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $123 | $287 |
$123
586
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $292 | $500 |
$292
1,172
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $467 | $675 |
$467
1,758
kWh
|
- | |
06 | 3.1191: Change procedures / equipment / operating conditions | $15,313 | $1,000 | - |
$15,313
-
gal
|
|
TOTAL RECOMMENDED | $21,458 | $10,910 |
$6,145
23,739
kWh
|
$15,313
-
gal
|
||
TOTAL IMPLEMENTED | $6,145 | $9,910 |
$6,145
23,739
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs