ITAC Assessment: MA0011
ITAC logo
ITAC Assessment: MA0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product INDUSTRIAL PLASTIC
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 380,000
lb
Production Hrs. Annual 6,528
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,658 1,403,869
kWh
LPG $75 6
MMBtu
Fuel Oil #4 $20,358 3,449
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,906

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.2511: Insulate bare equipment $1,481 $426 $1,738
23,154
kWh
$(-257.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,985 $548 $3,985
53,048
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $303 $200 - $303
-
MMBtu
04 2.2113: Repair or replace steam traps $1,051 $1,400 - $1,051
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $86 $185 $86
1,172
kWh
-
TOTAL RECOMMENDED $6,906 $2,759 $5,809
77,374
kWh
$1,097
-
MMBtu
TOTAL IMPLEMENTED $6,906 $2,759 $5,809
77,374
kWh
$1,097
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs