Assessment Year | 1984 |
---|---|
Principal Product | FORGINGS |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 225 |
Plant Area |
n/a
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,924 | 2,259,086 |
kWh
|
$0.075 |
Natural Gas | $33,848 | 32,963 |
MMBtu
|
$1.03 |
Fuel Oil #6 | $203,238 | 5,624 |
MMBtu
|
$36.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $89,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,072 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $553 | $62 |
$553
7,327
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $314 | - |
$364
4,982
kWh
|
- | $(-50.0) | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,993 | $200 |
$1,993
26,671
kWh
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $64,789 | $140,000 | - |
$64,789
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $22,212 | - | - |
$22,212
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $89,861 | $140,262 |
$2,910
38,980
kWh
|
$87,001
-
MMBtu
|
$(-50.0) | ||
TOTAL IMPLEMENTED | $25,072 | $262 |
$2,910
38,980
kWh
|
$22,212
-
MMBtu
|
$(-50.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs