ITAC Assessment: MA0005
ITAC logo
ITAC Assessment: MA0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FORGINGS
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,924 2,259,086
kWh
Natural Gas $33,848 32,963
MMBtu
Fuel Oil #6 $203,238 5,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $553 $62 $553
7,327
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $314 - $364
4,982
kWh
- $(-50.0)
03 2.4221: Install compressor air intakes in coolest locations $1,993 $200 $1,993
26,671
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $64,789 $140,000 - $64,789
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $22,212 - - $22,212
-
MMBtu
-
TOTAL RECOMMENDED $89,861 $140,262 $2,910
38,980
kWh
$87,001
-
MMBtu
$(-50.0)
TOTAL IMPLEMENTED $25,072 $262 $2,910
38,980
kWh
$22,212
-
MMBtu
$(-50.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs