ITAC Assessment: MA0004
ITAC logo
ITAC Assessment: MA0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product DISPOS. MEDICAL DEVICES
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,278 1,511,137
kWh
Fuel Oil #2 $43,244 6,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,079 $228 $4,778
67,409
kWh
$(-699.0)
-
MMBtu
02 2.6232: Install set-back timers $5,293 $500 $6,162
86,753
kWh
$(-869.0)
-
MMBtu
03 2.7314: Reduce ventilation air $33,473 $1,896 $6,344
89,390
kWh
$27,129
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,455 $200 - $1,455
-
MMBtu
TOTAL RECOMMENDED $44,300 $2,824 $17,284
243,552
kWh
$27,016
-
MMBtu
TOTAL IMPLEMENTED $44,300 $2,824 $17,284
243,552
kWh
$27,016
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs