ITAC Assessment: LT8459
ITAC logo
ITAC Assessment: LT8459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2027
Principal Product Commercial Aircraft Conversions, Modifications, and Refurbishment
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 145,273
ft2
Annual Production 50
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,748 3,057,400
kWh
Electricity Demand $198,995 9,907
kW-mo/yr
Electricity Fees $27,897 -
TOTAL YEARLY COSTS $419,640
RECOMMENDED SAVINGS* $37,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $483 $747 $181
2,873
kWh
$302
-
kW-mo/yr
02 2.6211: Conserve energy by efficient use of vending machines $567 $1,210 $529
8,403
kWh
$38
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,845 $508 $2,845
45,159
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,440 - $2,440
38,733
kWh
-
05 2.9114: Use solar heat to make electricty $26,467 $215,700 $7,181
13,983
kWh
$19,286
-
kW-mo/yr
06 2.7221: Lower temperature during the winter season and vice-versa $4,889 - $4,889
77,599
kWh
-
TOTAL RECOMMENDED $37,691 $218,165 $18,065
186,750
kWh
$19,626
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs