ITAC Assessment: LT8440
ITAC logo
ITAC Assessment: LT8440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Metal Pipes, Tubes, Joints
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 75,750
ft2
Annual Production 124,800
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,276 1,735,700
kWh
Electricity Demand $104,371 7,248
kW-mo/yr
Electricity Fees $20,598 -
TOTAL YEARLY COSTS $214,245
RECOMMENDED SAVINGS* $50,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $39,842 $5,254 $36,559
711,266
kWh
$3,283
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $1,634 $1,887 $834
16,234
kWh
$800
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $8,679 $8,150 $8,679
168,856
kWh
-
TOTAL RECOMMENDED $50,156 $15,291 $46,073
896,356
kWh
$4,083
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs