ITAC Assessment: LT8431
ITAC logo
ITAC Assessment: LT8431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Leased Space
NAICS 531120: Lessors of Nonresidential Buildings (except Miniwarehouses)
SIC 6512: Operators of Nonresidential Buildings
Sales Range $1
M
to 5
M
# of Employees 3
Plant Area 104,894
ft2
Annual Production 29
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,242 2,508,500
kWh
Electricity Demand $41,871 5,452
kW-mo/yr
Waste Disposal Costs
Water Usage $4,077 65
Tgal
Water Disposal $166 65
Tgal
TOTAL YEARLY COSTS $206,357
RECOMMENDED SAVINGS* $19,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $17,395 $1,861 $16,729
261,801
kWh
$698
-
kW-mo/yr
$(-32.1)
02 2.7135: Install occupancy sensors $1,691 $3,685 $1,442
22,574
kWh
$249
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $696 $420 $655
10,245
kWh
$41
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,782 $5,966 $18,826
294,619
kWh
$988
-
kW-mo/yr
$(-32.1)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs