ITAC Assessment: LT8426
ITAC logo
ITAC Assessment: LT8426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Office Space
NAICS 531120: Lessors of Nonresidential Buildings (except Miniwarehouses)
SIC 6512: Operators of Nonresidential Buildings
Sales Range $1
M
to 5
M
# of Employees 2
Plant Area 68,000
ft2
Annual Production 40
units
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,994 2,187,000
kWh
Electricity Demand $46,170 9,845
kW-mo/yr
Waste Disposal Costs
Water Usage $4,787 282
Tgal
Water Disposal $821 66
Tgal
TOTAL YEARLY COSTS $214,772
RECOMMENDED SAVINGS* $10,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Ancillary Material Cost Savings
01 4.126: Install sensors to detect defects $1,596 $616 - - $1,596
-
Tgal
-
02 2.7135: Install occupancy sensors $4,566 $2,288 $4,073
54,673
kWh
$493
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $3,416 $1,302 $3,166
42,495
kWh
$273
-
kW-mo/yr
- $(-22.5)
04 2.7442: Keep doors and windows shut when not on use $490 $250 $370
4,967
kWh
$119
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,068 $4,457 $7,609
102,136
kWh
$886
-
kW-mo/yr
$1,596
-
Tgal
$(-22.5)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs