ITAC Assessment: LT8424
ITAC logo
ITAC Assessment: LT8424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Repair Paper Mill Rollers
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 7
Plant Area 303,803
ft2
Annual Production 600
units
Production Hrs. Annual 6,264
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,589 2,612,640
kWh
Electricity Demand $8,498 3,810
kW-mo/yr
LPG $5,832 155
MMBtu
Waste Disposal Costs
Water Usage $2,239 835
Tgal
Water Disposal $4,563 960
Tgal
TOTAL YEARLY COSTS $208,721
RECOMMENDED SAVINGS* $13,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,630 $405 $4,630
64,486
kWh
- - -
02 2.6218: Turn off equipment when not in use $842 $1,318 $782
10,893
kWh
$60
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,005 $1,360 $949
13,210
kWh
$57
-
kW-mo/yr
- -
04 2.1321: Replace fossil fuel equipment with electrical equipment $7,076 $165,000 $(-793.2)
(-11,047)
kWh
- $5,832
-
MMBtu
$2,038
TOTAL RECOMMENDED $13,554 $168,084 $5,568
77,542
kWh
$117
-
kW-mo/yr
$5,832
-
MMBtu
$2,038
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs