ITAC Assessment: LT8389
ITAC logo
ITAC Assessment: LT8389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product University
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range $500
k
to 1
M
# of Employees 70
Plant Area 50,462
ft2
Annual Production 1
units
Production Hrs. Annual 4,704
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,098 1,223,691
kWh
Electricity Demand $49,491 3,114
kW-mo/yr
Natural Gas $7,278 1,674
MMBtu
Waste Disposal Costs
Water Usage $7,333 1,886
Tgal
TOTAL YEARLY COSTS $167,200
RECOMMENDED SAVINGS* $32,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,202 $9,013 $2,202
26,117
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,009 $31,373 $18,418
218,481
kWh
$7,591
-
kW-mo/yr
-
03 2.7226: Use computer programs to optimize hvac performance $2,007 $5,135 - - $2,007
-
MMBtu
04 2.7263: Lower compressor pressure through a/c system modification $2,291 - $2,291
27,183
kWh
- -
TOTAL RECOMMENDED $32,510 $45,520 $22,911
271,781
kWh
$7,591
-
kW-mo/yr
$2,007
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs