Assessment Year | 2001 |
---|---|
Principal Product | thermal processing |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
50,000
ft2
|
Annual Production | 32,500,000
lb
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $218,006 | 3,824,586 |
kWh
|
$0.057 |
Electricity Demand | $73,486 | 8,892 |
kW-mo/yr
|
$8.26 |
Electricity Fees | $135,848 | - |
|
- |
Natural Gas | $160,969 | 26,224 |
MMBtu
|
$6.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $305,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $205,399 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,625 | $869 |
$1,387
20,043
kWh
|
$238
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,709 | - |
$2,275
32,886
kWh
|
$434
-
kW-mo/yr
|
- | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $81,101 | $150,000 | - | - |
$81,101
-
MMBtu
|
- | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,792 | $11,800 | - | - | - | - | $4,792 | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,575 | $300 | - | - | - | - | $1,575 | |
06 | 4.426: Modify workload | $201,115 | $1,000 | - | - | - | $201,115 | - | |
07 | 4.426: Modify workload | $12,653 | $1,199 | - | - | - | $12,653 | - | |
TOTAL RECOMMENDED | $305,570 | $165,168 |
$3,662
52,929
kWh
|
$672
-
kW-mo/yr
|
$81,101
-
MMBtu
|
$213,768 | $6,367 | ||
TOTAL IMPLEMENTED | $205,399 | $1,300 |
$2,275
32,886
kWh
|
$434
-
kW-mo/yr
|
- | $201,115 | $1,575 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs