ITAC Assessment: LM0020
ITAC logo
ITAC Assessment: LM0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product thermal processing
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 50,000
ft2
Annual Production 32,500,000
lb
Production Hrs. Annual 3,744
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,006 3,824,586
kWh
Electricity Demand $73,486 8,892
kW-mo/yr
Electricity Fees $135,848 -
Natural Gas $160,969 26,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $305,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $205,399

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,625 $869 $1,387
20,043
kWh
$238
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,709 - $2,275
32,886
kWh
$434
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $81,101 $150,000 - - $81,101
-
MMBtu
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,792 $11,800 - - - - $4,792
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,575 $300 - - - - $1,575
06 4.426: Modify workload $201,115 $1,000 - - - $201,115 -
07 4.426: Modify workload $12,653 $1,199 - - - $12,653 -
TOTAL RECOMMENDED $305,570 $165,168 $3,662
52,929
kWh
$672
-
kW-mo/yr
$81,101
-
MMBtu
$213,768 $6,367
TOTAL IMPLEMENTED $205,399 $1,300 $2,275
32,886
kWh
$434
-
kW-mo/yr
- $201,115 $1,575
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs