ITAC Assessment: LT8370
ITAC logo
ITAC Assessment: LT8370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Industrial Valve
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $100
M
to 500
M
# of Employees 265
Plant Area 264,930
ft2
Annual Production 55,000
units
Production Hrs. Annual 5,980
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,619,482 15,973,099
kWh
Electricity Demand $402,437 27,946
kW-mo/yr
Electricity Fees $40,438 -
Natural Gas $103,872 10,184
MMBtu
Waste Disposal Costs
Water Usage $22,990 6,928
Tgal
TOTAL YEARLY COSTS $2,189,219
RECOMMENDED SAVINGS* $54,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $11,372 $1,800 $11,372
112,590
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $13,034 - $13,034
129,048
kWh
-
03 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $24,363 - $6,678
66,117
kWh
$17,685
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,864 $8,022 $5,864
58,055
kWh
-
TOTAL RECOMMENDED $54,631 $9,822 $36,947
365,810
kWh
$17,685
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs