ITAC Assessment: LT0140
ITAC logo
ITAC Assessment: LT0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LAMINATED FILM FOR PACKAGING
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,208 3,490,035
kWh
Natural Gas $91,836 20,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $4,045 $1,350 $3,000
93,494
kWh
$1,045
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $635 $960 - $635
-
MMBtu
-
03 2.2511: Insulate bare equipment $945 $680 $945
29,308
kWh
- -
04 2.4133: Use most efficient type of electric motors $289 $505 $289
7,034
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $322 - $322
7,620
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $977 $303 $1,100
25,498
kWh
- $(-123.0)
TOTAL RECOMMENDED $7,213 $3,798 $5,656
162,954
kWh
$1,680
-
MMBtu
$(-123.0)
TOTAL IMPLEMENTED $5,312 $2,030 $4,267
130,422
kWh
$1,045
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs