| Assessment Year | 1988 |
|---|---|
| Principal Product | DIE CASTINGS |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 115 |
| Plant Area |
n/a
|
| Annual Production | 2,000,000
lb
|
| Production Hrs. Annual | 3,952
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $312,153 | 5,174,092 |
kWh
|
$0.060 |
| Natural Gas | $158,899 | 36,693 |
MMBtu
|
$4.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,516 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,880 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,880 | - | - |
$10,480
-
MMBtu
|
$(-600.0) | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $21,475 | $20,000 |
$(-1,604.0)
(-36,342)
kWh
|
$23,079
-
MMBtu
|
- | |
| 03 | 2.2511: Insulate bare equipment | $1,250 | $1,785 |
$1,250
39,273
kWh
|
- | - | |
| 04 | 2.1321: Replace fossil fuel equipment with electrical equipment | $17,073 | $6,027 |
$(-1,286.0)
(-40,445)
kWh
|
$18,359
-
MMBtu
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $1,085 | $600 |
$1,085
33,998
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $695 | - |
$695
12,016
kWh
|
- | - | |
| 07 | 2.4133: Use most efficient type of electric motors | $1,020 | $1,855 |
$1,020
16,706
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38 | $37 |
$38
586
kWh
|
- | - | |
| TOTAL RECOMMENDED | $52,516 | $30,304 |
$1,198
25,792
kWh
|
$51,918
-
MMBtu
|
$(-600.0) | ||
| TOTAL IMPLEMENTED | $9,880 | - | - |
$10,480
-
MMBtu
|
$(-600.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs