| Assessment Year | 1988 |
|---|---|
| Principal Product | PLASTIC PELLETS |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 60,000,000
lb
|
| Production Hrs. Annual | 8,136
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $498,493 | 1,163,540 |
kWh
|
$0.43 |
| Natural Gas | $56,692 | 8,126 |
MMBtu
|
$6.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,301 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,529 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $859 | $600 | - |
$859
-
MMBtu
|
- | |
| 02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $398 | $230 | - |
$398
-
MMBtu
|
- | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,270 | - | - |
$1,270
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $3,190 | $1,625 |
$3,190
84,994
kWh
|
- | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,450 | $1,781 |
$1,450
38,394
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,810 | - |
$2,810
74,736
kWh
|
- | - | |
| 07 | 2.7261: Install timers and/or thermostats | $590 | $300 |
$590
21,981
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,734 | $183 |
$1,803
46,893
kWh
|
- | $(-69.0) | |
| TOTAL RECOMMENDED | $12,301 | $4,719 |
$9,843
266,998
kWh
|
$2,527
-
MMBtu
|
$(-69.0) | ||
| TOTAL IMPLEMENTED | $5,529 | $900 |
$3,400
96,717
kWh
|
$2,129
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs