ITAC Assessment: LT0126
ITAC logo
ITAC Assessment: LT0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STEEL FRAMES & FIBERGLASS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,977 1,016,706
kWh
Natural Gas $257 37
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $88 $135 $88
1,465
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $113 $50 $113
1,758
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $53 $79
1,172
kWh
- $(-11.0)
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $9,060 $3,200 $9,060
181,712
kWh
- -
05 2.7261: Install timers and/or thermostats $1,541 $600 $953
17,292
kWh
$588
-
MMBtu
-
06 2.6124: Establish equipment maintenance schedule $324 $100 $324
6,448
kWh
- -
TOTAL RECOMMENDED $11,194 $4,138 $10,617
209,847
kWh
$588
-
MMBtu
$(-11.0)
TOTAL IMPLEMENTED $2,021 $888 $1,444
26,377
kWh
$588
-
MMBtu
$(-11.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs