ITAC Assessment: LT0125
ITAC logo
ITAC Assessment: LT0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GASOLINE AND LPG
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area
n/a
Annual Production 105,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $629,326 12,364,889
kWh
Natural Gas $1,421,173 812,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $6,731 $4,520 - $6,731
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $1,280 $1,000 - $1,280
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $3,274 $3,661 $3,274
73,564
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,655 - $4,655
93,200
kWh
- -
05 2.6232: Install set-back timers $3,000 - $3,000
74,443
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $226 $97 $265
6,741
kWh
- $(-39.0)
07 2.7261: Install timers and/or thermostats $191 $300 $191
4,689
kWh
- -
TOTAL RECOMMENDED $19,357 $9,578 $11,385
252,637
kWh
$8,011
-
MMBtu
$(-39.0)
TOTAL IMPLEMENTED $15,892 $5,617 $7,920
174,384
kWh
$8,011
-
MMBtu
$(-39.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs