ITAC Assessment: LT0124
ITAC logo
ITAC Assessment: LT0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product LEAD ACID BATTERIES
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,400,000
pieces
Production Hrs. Annual 4,312
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $629,985 10,631,008
kWh
Natural Gas $249,096 48,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $64,900 $12,000 $49,000
1,058,030
kWh
$15,900
-
MMBtu
-
02 2.2515: Use optimum thickness insulation $9,378 $2,760 $5,292
114,302
kWh
$4,086
-
MMBtu
-
03 2.5194: Redesign process $6,995 - $6,160
133,353
kWh
$835
-
MMBtu
-
04 2.2211: Use optimum temperature $3,576 - $2,900
62,720
kWh
$676
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $2,660 $2,693 $2,660
49,824
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,640 - $4,640
89,097
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,049 $453 $2,260
42,497
kWh
- $(-211.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $247 $55 $261
4,982
kWh
- $(-14.0)
09 2.7261: Install timers and/or thermostats $979 $1,050 $568
12,309
kWh
$411
-
MMBtu
-
TOTAL RECOMMENDED $95,424 $19,011 $73,741
1,567,114
kWh
$21,908
-
MMBtu
$(-225.0)
TOTAL IMPLEMENTED $95,424 $19,011 $73,741
1,567,114
kWh
$21,908
-
MMBtu
$(-225.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs