ITAC Assessment: LT0121
ITAC logo
ITAC Assessment: LT0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product KILN DRIED LUMBER
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area
n/a
Annual Production 44,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $507,158 8,961,313
kWh
Natural Gas $665 100
MMBtu
Wood $353,250 1,350,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $22,200 $7,900 - - $22,200
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,200 - $1,200
19,930
kWh
- -
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $472 $268 $472
9,086
kWh
- -
04 2.7261: Install timers and/or thermostats $553 $150 $224
4,689
kWh
$329
-
MMBtu
-
TOTAL RECOMMENDED $24,425 $8,318 $1,896
33,705
kWh
$329
-
MMBtu
$22,200
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs