ITAC Assessment: LT0100
ITAC logo
ITAC Assessment: LT0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product BATHTUBS & ENCLOSURES
NAICS
n/a
SIC 3088: Plastics Plumbing Fixtures
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area
n/a
Annual Production 108,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,854 995,604
kWh
Natural Gas $21,590 5,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $66 $110
1,465
kWh
-
02 2.2511: Insulate bare equipment $130 $328 - $130
-
MMBtu
03 2.2531: Re-size charging openings or add movable cover or door $1,160 - - $1,160
-
MMBtu
04 2.1122: Re-size charging openings or add a movable door on equipment $2,910 $410 - $2,910
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $129 - $129
1,465
kWh
-
06 2.4133: Use most efficient type of electric motors $134 $301 $134
1,758
kWh
-
07 2.7261: Install timers and/or thermostats $316 - $223
3,517
kWh
$93
-
MMBtu
TOTAL RECOMMENDED $4,889 $1,105 $596
8,205
kWh
$4,293
-
MMBtu
TOTAL IMPLEMENTED $4,649 $711 $486
6,740
kWh
$4,163
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs