ITAC Assessment: LT0091
ITAC logo
ITAC Assessment: LT0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FENCE TUBING
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 20,000
ton
Production Hrs. Annual 6,728
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,146 6,219,519
kWh
Natural Gas $130,287 31,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $506 $664 $506
9,672
kWh
- -
02 2.2511: Insulate bare equipment $514 $159 - $514
-
MMBtu
-
03 2.6232: Install set-back timers $140 $270 $140
3,810
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,584 $1,908 $1,584
30,481
kWh
- -
05 2.4322: Use or replace with energy efficient substitutes $19,000 $10,000 - $19,000
-
MMBtu
-
06 2.5194: Redesign process $15,700 $2,000 - $15,700
-
MMBtu
-
07 3.4151: Minimize water usage $1,400 $150 - - $1,400
TOTAL RECOMMENDED $38,844 $15,151 $2,230
43,963
kWh
$35,214
-
MMBtu
$1,400
TOTAL IMPLEMENTED $37,304 $14,731 $2,090
40,153
kWh
$35,214
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs