ITAC Assessment: BD0009
ITAC logo
ITAC Assessment: BD0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Toroidal Reels
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 105,000
ft2
Annual Production 7,600
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,858 819,168
kWh
Natural Gas $60,497 13,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Administrative Changes Savings
01 2.2531: Re-size charging openings or add movable cover or door $8,608 $12,904 $8,608
-
MMBtu
-
02 2.2531: Re-size charging openings or add movable cover or door $4,553 $5,412 $4,553
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,666 $1,430 $1,666
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $226 $100 $226
-
MMBtu
-
05 2.8113: Purchase gas directly from a contract gas supplier $14,608 $1,500 - $14,608
TOTAL RECOMMENDED $29,661 $21,346 $15,053
-
MMBtu
$14,608
TOTAL IMPLEMENTED $1,892 $1,530 $1,892
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs