ITAC Assessment: LT0077
ITAC logo
ITAC Assessment: LT0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product COPPER WIRE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 27,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,237 6,881,594
kWh
Natural Gas $21,022 4,997
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $373 $170 $373
6,155
kWh
02 2.6232: Install set-back timers $470 $130 $470
13,482
kWh
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,530 $11,640 $5,530
160,023
kWh
04 2.2514: Cover open tanks $1,540 $20 $1,540
32,825
kWh
05 2.4133: Use most efficient type of electric motors $1,457 $1,160 $1,457
30,774
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,400 - $4,400
92,907
kWh
TOTAL RECOMMENDED $13,770 $13,120 $13,770
336,166
kWh
TOTAL IMPLEMENTED $7,770 $1,350 $7,770
162,661
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs