ITAC Assessment: LT0052
ITAC logo
ITAC Assessment: LT0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product DRILL BITS & END MILLS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 177
Plant Area
n/a
Annual Production 2,012,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,594 6,072,978
kWh
Natural Gas $17,377 4,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,979

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,660 $1,476 $5,660
118,406
kWh
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,370 $1,220 $3,370
70,340
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,795 $4,990 $2,795
58,617
kWh
04 2.4133: Use most efficient type of electric motors $1,659 $1,632 $1,659
35,463
kWh
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $735 $770 $735
31,067
kWh
06 2.6232: Install set-back timers $1,865 - $1,865
39,859
kWh
07 2.7422: Plant trees or shrubs near windows to shield from sunlight $556 $1,470 $556
23,447
kWh
TOTAL RECOMMENDED $16,640 $11,558 $16,640
377,199
kWh
TOTAL IMPLEMENTED $11,979 $8,098 $11,979
252,345
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs