ITAC Assessment: LT0038
ITAC logo
ITAC Assessment: LT0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MOLDED PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,875 4,199,883
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,890 $350 $4,890
113,716
kWh
02 2.2511: Insulate bare equipment $3,109 $1,120 $3,109
72,392
kWh
03 2.7261: Install timers and/or thermostats $944 $100 $944
21,688
kWh
04 2.2443: Re-use or recycle hot or cold process exhaust air $10,144 $1,900 $10,144
189,332
kWh
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,399 $1,930 $1,399
17,585
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,163 $299 $2,163
39,273
kWh
TOTAL RECOMMENDED $22,649 $5,699 $22,649
453,986
kWh
TOTAL IMPLEMENTED $15,978 $2,350 $15,978
324,736
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs