ITAC Assessment: LT0029
ITAC logo
ITAC Assessment: LT0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product INDUSTRIAL BAGS
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 425
Plant Area
n/a
Annual Production 37,500
ton
Production Hrs. Annual 7,488
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,149 5,313,013
kWh
Natural Gas $36,487 7,934
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $170 $111 - $170
-
MMBtu
02 2.2437: Recover waste heat from equipment $6,840 $2,000 - $6,840
-
MMBtu
03 2.7261: Install timers and/or thermostats $2,230 $450 - $2,230
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $713 $150 $713
17,292
kWh
-
TOTAL RECOMMENDED $9,953 $2,711 $713
17,292
kWh
$9,240
-
MMBtu
TOTAL IMPLEMENTED $3,113 $711 $713
17,292
kWh
$2,400
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs