Assessment Year | 1985 |
---|---|
Principal Product | CORRUGATED PACKAGING |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
n/a
|
Annual Production | 684
thousand feet
|
Production Hrs. Annual | 6,780
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $321,442 | 5,063,013 |
kWh
|
$0.063 |
Natural Gas | $236,001 | 54,737 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,329 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,819 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,318 | $300 | - |
$8,318
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $19,870 | $11,300 | - |
$19,870
-
MMBtu
|
- | |
03 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,340 | $405 | - |
$1,340
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $1,384 | $138 | - |
$1,384
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $2,460 | $15 | - |
$2,460
-
MMBtu
|
- | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,239 | $2,800 |
$1,094
19,930
kWh
|
- | $145 | |
07 | 2.7261: Install timers and/or thermostats | $4,208 | $300 |
$2,385
37,515
kWh
|
$1,823
-
MMBtu
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,510 | $3,337 |
$7,510
152,989
kWh
|
- | - | |
TOTAL RECOMMENDED | $46,329 | $18,595 |
$10,989
210,434
kWh
|
$35,195
-
MMBtu
|
$145 | ||
TOTAL IMPLEMENTED | $38,819 | $15,258 |
$3,479
57,445
kWh
|
$35,195
-
MMBtu
|
$145 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs