ITAC Assessment: LT0026
ITAC logo
ITAC Assessment: LT0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CORRUGATED PACKAGING
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area
n/a
Annual Production 684
thousand feet
Production Hrs. Annual 6,780
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,442 5,063,013
kWh
Natural Gas $236,001 54,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,318 $300 - $8,318
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $19,870 $11,300 - $19,870
-
MMBtu
-
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,340 $405 - $1,340
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $1,384 $138 - $1,384
-
MMBtu
-
05 2.2135: Repair and eliminate steam leaks $2,460 $15 - $2,460
-
MMBtu
-
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,239 $2,800 $1,094
19,930
kWh
- $145
07 2.7261: Install timers and/or thermostats $4,208 $300 $2,385
37,515
kWh
$1,823
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $7,510 $3,337 $7,510
152,989
kWh
- -
TOTAL RECOMMENDED $46,329 $18,595 $10,989
210,434
kWh
$35,195
-
MMBtu
$145
TOTAL IMPLEMENTED $38,819 $15,258 $3,479
57,445
kWh
$35,195
-
MMBtu
$145
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs