ITAC Assessment: LT0012
ITAC logo
ITAC Assessment: LT0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product OIL FIELD TOOLS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 880
pieces
Production Hrs. Annual 2,550
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,866 1,038,101
kWh
Natural Gas $13,855 2,578
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $2,600 $691 $2,600
75,029
kWh
- -
02 2.2511: Insulate bare equipment $2,100 $2,958 $2,100
60,668
kWh
- -
03 2.2514: Cover open tanks $142 $36 $142
4,103
kWh
- -
04 2.2511: Insulate bare equipment $102 $160 $102
2,931
kWh
- -
05 2.7261: Install timers and/or thermostats $4,638 $186 $1,416
41,032
kWh
$3,222
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $1,400 $567
10,258
kWh
- $80
TOTAL RECOMMENDED $10,229 $5,431 $6,927
194,021
kWh
$3,222
-
MMBtu
$80
TOTAL IMPLEMENTED $7,487 $4,704 $4,185
114,889
kWh
$3,222
-
MMBtu
$80
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs