ITAC Assessment: LS2602
ITAC logo
ITAC Assessment: LS2602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Industrial Wood Pallets
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 4,356,000
ft2
Annual Production 2,600,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $397,134 4,022,148
kWh
Electricity Demand $101,921 24,859
kW-mo/yr
Fuel Oil #1 $308,099 12,733
MMBtu
TOTAL YEARLY COSTS $807,154
RECOMMENDED SAVINGS* $349,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Personnel Changes Savings Administrative Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $272,631 $722,745 $(-2,224.0)
(-22,464)
kWh
$154,855
-
MMBtu
- $120,000
02 2.4224: Upgrade controls on compressors $3,960 $12,500 $3,960
39,999
kWh
- - -
03 2.7425: Clean or color roof to reduce solar load $3,415 $10,866 $3,415
34,150
kWh
- - -
04 4.652: Replace existing equipment with more suitable substitutes $38,310 $276,975 $3,840
38,792
kWh
- $34,470 -
05 2.9114: Use solar heat to make electricty $31,666 $375,570 $31,666
319,860
kWh
- - -
TOTAL RECOMMENDED $349,982 $1,398,656 $40,657
410,337
kWh
$154,855
-
MMBtu
$34,470 $120,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs