ITAC Assessment: CO0631
ITAC logo
ITAC Assessment: CO0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Motor oil
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 197,400
ft2
Annual Production 520,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,338 1,052,928
kWh
Electricity Demand $49,727 2,999
kW-mo/yr
Electricity Fees $3,147 -
Natural Gas $25,982 3,155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $1,000 $19,665 $230
6,300
kWh
$770
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,360 $3,977 $5,070
132,700
kWh
$6,930
-
kW-mo/yr
$150 $210
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,020 $5,662 $590
15,900
kWh
$1,190
-
kW-mo/yr
$30 $210
04 2.9114: Use solar heat to make electricty $1,920 $27,104 $560
14,600
kWh
$1,360
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,710 $8,757 $640
17,500
kWh
$1,140
-
kW-mo/yr
$30 $(-100.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,020 $37,620 $110
3,000
kWh
$70
-
kW-mo/yr
$380 $460
07 2.7142: Utilize higher efficiency lamps and/or ballasts $600 $3,108 $140
3,900
kWh
$250
-
kW-mo/yr
$40 $170
TOTAL RECOMMENDED $20,630 $105,893 $7,340
193,900
kWh
$11,710
-
kW-mo/yr
$630 $950
TOTAL IMPLEMENTED $20,630 $105,893 $7,340
193,900
kWh
$11,710
-
kW-mo/yr
$630 $950
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs