ITAC Assessment: LS2521
ITAC logo
ITAC Assessment: LS2521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Bolted Storage Tank
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 34,725
ft2
Annual Production 40
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,801 439,218
kWh
Electricity Demand $40,874 2,337
kW-mo/yr
Natural Gas $14,175 997
MMBtu
Fuel Oil #1 $5,900 316
MMBtu
Fuel Oil #2 $9,900 843
MMBtu
Waste Disposal Costs
Water Usage $2,442 3,102
Tgal
TOTAL YEARLY COSTS $111,092
RECOMMENDED SAVINGS* $116,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7261: Install timers and/or thermostats $1,212 $25 $1,212
14,096
kWh
- -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $796 $300 $796
9,256
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $746 $392 $746
8,676
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,368 $2,575 $1,161
13,498
kWh
$1,207
-
kW-mo/yr
-
05 2.7425: Clean or color roof to reduce solar load $3,125 $12,153 $3,125
36,337
kWh
- -
06 4.652: Replace existing equipment with more suitable substitutes $70,474 $710,000 $2,414
28,080
kWh
- $68,060
07 2.9114: Use solar heat to make electricty $37,653 $526,500 $37,653
437,832
kWh
- -
TOTAL RECOMMENDED $116,374 $1,251,945 $47,107
547,775
kWh
$1,207
-
kW-mo/yr
$68,060
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs