ITAC Assessment: LS2508
ITAC logo
ITAC Assessment: LS2508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product CNC Machined Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area 53,544
ft2
Annual Production 1,800,000
units
Production Hrs. Annual 4,862
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,137 649,680
kWh
Electricity Demand $12,326 2,726
kW-mo/yr
Other Gas $1,045 38
MMBtu
TOTAL YEARLY COSTS $79,508
RECOMMENDED SAVINGS* $69,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $771 $675 $694
6,806
kWh
$77
-
kW-mo/yr
- -
02 2.8117: Install sub-metering equipment $3,313 $3,000 $3,313
32,484
kWh
- - -
03 4.322: Eliminate old stock and modify inventory control $9,000 $25,000 - - - $9,000
04 2.7232: Replace existing hvac unit with high efficiency model $1,488 $5,190 $1,488
14,586
kWh
- - -
05 2.9114: Use solar heat to make electricty $39,572 $160,992 $39,572
387,960
kWh
- - -
06 2.4133: Use most efficient type of electric motors $2,510 $10,600 $2,510
24,612
kWh
- - -
07 2.4226: Use / purchase optimum sized compressor $3,709 $16,949 $3,709
36,365
kWh
- - -
08 2.1321: Replace fossil fuel equipment with electrical equipment $8,663 $48,183 $(-382.0)
(-3,744)
kWh
- $1,045
-
MMBtu
$8,000
TOTAL RECOMMENDED $69,026 $270,589 $50,904
499,069
kWh
$77
-
kW-mo/yr
$1,045
-
MMBtu
$17,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs