ITAC Assessment: LS2507
ITAC logo
ITAC Assessment: LS2507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Industrial Pipe
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 161,437
ft2
Annual Production 20,800
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,993 587,000
kWh
Electricity Demand $17,753 3,659
kW-mo/yr
Fuel Oil #2 $38,513 1,683
MMBtu
TOTAL YEARLY COSTS $125,259
RECOMMENDED SAVINGS* $61,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $1,382 $525 $1,382
11,711
kWh
- -
02 2.8117: Install sub-metering equipment $3,463 $3,000 $3,463
29,350
kWh
- -
03 2.1321: Replace fossil fuel equipment with electrical equipment $44,252 $192,732 $(-3,240.0)
(-27,456)
kWh
$15,492
-
MMBtu
$32,000
04 2.4322: Use or replace with energy efficient substitutes $12,714 $65,000 $(-9,595.0)
(-81,314)
kWh
$22,309
-
MMBtu
-
TOTAL RECOMMENDED $61,811 $261,257 $(-7,990.0)
(-67,709)
kWh
$37,801
-
MMBtu
$32,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs