ITAC Assessment: LS2421
ITAC logo
ITAC Assessment: LS2421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fish Oil
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2077: Animal and Marine Fats and Oils
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 654,098
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,160
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,081,835 8,877,110
kWh
Waste Disposal Costs
Water Disposal $599,999 4,500
Tgal
TOTAL YEARLY COSTS $1,681,834
RECOMMENDED SAVINGS* $802,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings
01 2.4131: Size electric motors for peak operating efficiency $33,742 $15,900 $33,742
276,576
kWh
-
02 2.4224: Upgrade controls on compressors $8,504 $12,500 $8,504
69,706
kWh
-
03 3.3133: Use other waste concentration methods $590,512 $783,539 $(-9,487.0)
(-77,760)
kWh
$599,999
-
Tgal
04 2.9121: Install wind powered electric generator $148,851 $560,000 $148,851
1,220,093
kWh
-
05 4.662: Level one – add communication using iiot devices to existing control system to modify operations $21,228 $141,000 $21,228
174,004
kWh
-
TOTAL RECOMMENDED $802,837 $1,512,939 $202,838
1,662,619
kWh
$599,999
-
Tgal
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs